Augustus Road Resurfacing

Augustus Rd in Edgbaston will be resurfaced the week beginning Monday February 8th. Diversions will be in operation at the times shown on the sign pictured below. On Saturday the closure will be taken off during the day time.

Jan 2010 147

The road will be resurfaced with a high quality asphalt surfacing material which will give a quieter than normal surface texture.

Access to frontages will be provided and contractor operatives will be on hand to assist where necessary.

Advertisements
This entry was posted in Blog. Bookmark the permalink.